Disclaimer
Training material only. This is not a replacement for any site-specific procedures or documentation. Alpha 360 LLC is not responsible for any employee deviation from their company's policies. Any reproduction of Alpha 360 LLC documents is strictly prohibited.
Site Alpha is a fictional reference facility. Equipment is drawn as generic, unbranded equipment. Bench timing is a training model: it follows the Site Alpha fact base, not any real controller.
train 360. run 24/7. · © 2026 Alpha 360 LLC
Sources
Site Alpha fact base v2, approved 30 Oct 2026 (Sections 3, 4, 5 and 10: chillers, pumps, TK-1 / TV-101, HX-1 modes, instrument air, MVS-A / MVS-B, GPS-A / GPS-B, generators, UPS 2N+2, control room rule, drills ECON-01, ECON-02, ROT-01, LOU-01); owner decisions 31 Oct 2026 (chiller flow switches FS-n1 / FS-n2 are start permissives and trip a running chiller on loss of flow; TV-101 begins opening at TT-101 61 °F; 60 s hold before a chiller restart after power returns)
NFPA 110, Standard for Emergency and Standby Power Systems (Level 1, Type 10): www.nfpa.org
IEEE C37.2, Standard for Electrical Power System Device Function Numbers (25 synchronism check, 27 undervoltage, 32 reverse power, 50/51, 86): standards.ieee.org
OSHA, 29 CFR 1910.147, The control of hazardous energy (lockout/tagout): www.osha.gov
ASHRAE Handbook—HVAC Systems and Equipment (chilled-water plants, waterside economizers, thermal storage): www.ashrae.org
Alpha 360 LLC, Site Alpha 3D rooms 01–12 (walkdown fault IDs shared with this bench; see FAULT-IDS.md)